Completed Number 1 and 4 of my winter to do list.
Number 1 was replace the upper control arms. You can see how that's done here:
www.benzworld.org
Next up is fix leaks and powder coat the VC and intake manifold. That will put the car down for some time but I would like to get it done early as I no longer have a heated garage.
Number 1 was replace the upper control arms. You can see how that's done here:
Upper control arms and lower ball joint boot.
So on my list of winter projects, see What are your winter projects I have completed #4, breaks, and today I was about to start #2 oil leak gut then parts came in for #1, upper control arms. So I proceeded to do the upper control arms which went very well, except (there is always an except)...
Next up is fix leaks and powder coat the VC and intake manifold. That will put the car down for some time but I would like to get it done early as I no longer have a heated garage.